× |
|
RKI GX-3R Pro, 5 gas, LEL / O2 / combo H2S & CO / % CO2 with 100-240 VAC charger, 72-PAB-C |
$1,380.00 |
|
$2,760.00 |
× |
|
RKI GX-3R Pro, 4 gas, LEL / O2 / H2S / CO (H2 compensated) with 100-240 VAC charger, 72-PCX-C |
$1,026.00 |
|
$1,026.00 |
× |
|
GX-6000, 6 Gas Meter, LEL / O2 / H2S / CO / VOC’s (0 - 6,000 ppm PID) / HCN , 72-6ABL-C |
$3,555.00 |
|
$3,555.00 |
× |
|
RKI GX-3R, 2 gas, LEL / O2 with 100-240 VAC charger, 72-RG-C |
$545.00 |
|
$545.00 |
× |
|
TPPR-W Power Supply Unit - 80A + Fault Tolerant + UPS + Power Distribution |
$15,021.00 |
|
$15,021.00 |
× |
|
RKI GX-3R, 3 gas, LEL / O2 / CO with 100-240 VAC charger, 72-RC-C |
$595.00 |
|
$595.00 |
× |
|
RKI EAGLE Calibration Kit, 103L steel cyl 50% LEL Isobutane/Air, dem flow reg, case & tubing |
$525.00 |
|
$1,050.00 |
× |
|
Cable with connector for LEL and TC sensors for EAGLE/EAGLE 2 |
$21.40 |
|
$42.80 |
× |
|
Edge Clip Assembly & Screw - For the EDGE Dosimeters, Includes (1) 053-761 Clip Assembly and (1) 053-621 Screw |
$25.00 |
|
$25.00 |
|